by
Penni Dunning 3 de maio de 2013
The Corps is slated to begin prepping the site this spring for the subsequent removal of radiological contaminants. Engineered openings are to perform such that the difference between the exterior and interior water levels shall not exceed 1 foot during base flood conditions. In speaking with Argus ...